BS EN 12350-1 PDF

Buy BS EN TESTING FRESH CONCRETE – PART 1: SAMPLING from SAI Global. said in BS EN , take a few samples throughout the pour for the best representation of the batch and make sure you take % of what you think you’ll . This British Standard specifies two procedures for sampling fresh concrete which are implemented by composite sampling and by spot.

Author: Kagakree Tetaur
Country: Antigua & Barbuda
Language: English (Spanish)
Genre: Education
Published (Last): 6 April 2014
Pages: 18
PDF File Size: 1.73 Mb
ePub File Size: 3.22 Mb
ISBN: 173-5-18014-270-5
Downloads: 94342
Price: Free* [*Free Regsitration Required]
Uploader: Nikogami

This site uses cookies. This European Standard specifies two procedures for sampling fresh concrete, by composite sampling and by spot sampling. Record the temperature to the nearest 0.

BS EN 12350-1:2009

The mold is raised and the concrete allowed to subside. The Red document status indicator indicates that the document is an old version The document has likely been withdrawn by the publisher, also the meta data presented here may be out of date as it is no longer being maintained by the editorial teams at NBS. Difference of the two samplings — E sampling is more diverse as it is the representative of the whole truck load.

I have a presentation subsequent week, and I am on the look for such info. Ba compaction is achieved using mechanical vibration, when there no further appearance of large air bubbles on the surface of the concrete and the surface becomes relatively smooth with a glazed appearance, without excessive segregation.

This document Older versions.

Move the scoop 123550-1 the perimeter of the mold to ensure even distribution of material and minimize segregation. Minimum size of sample x 1. After compaction of each layer, tap the sides of the container smartly with the mallet until large bubbles of air cease to appear on the surface and depressions left by the compacting rod or bar, are removed. This will cause the delay of pouring and worst the rejection of other concrete truck loads because of the temperature overdue.

  JOMINY END QUENCH TEST PDF

BS EN 12350-1/BS EN 12350-2/BS EN 12390-2/BS EN 12390-2

Want access to British Standards? If a falling away or shearing occurs, disregard test and make a new test using another portion of the sample. Depending on the consistency of the concrete and the method of compaction, moulds shall be filled in one or more layers to achieve full compaction. What is the time limit before placing of fresh concrete?

BS EN – Testing fresh concrete. Sampling – BSI British Standards

Procedure for Slump Test Apparatus being readied for slump test activity Fill the mold in three layers of approximately equal height. Free to use BIM project management tool provides step-by-step help to define, manage and validate responsibility for information development and delivery at each stage of the asset life cycle in level 2 BIM projects. Concrete cubes at the bw Marking The test specimens shall be marked clearly em indelibly, without damaging the specimen using a cub tag that contains the information related to the specimen Casting date, ticket number, specimen ID, location of sampling….

Protect the sample from the sun, wind, and other sources of rapid evaporation, and from contamination. If the tamping operation of the top layer results in subsidence of the concrete below the top edge of the mould, add more concrete to keep an excess above the top of the mould at all times. Please first log in with a verified email before subscribing to alerts. Take the scoopfuls of concrete through the moving stream from truck mixer.

In the case of self-compacting concrete, the mould shall be filled in one operation and no mechanical compaction shall be applied during filling or after the mould is filled. Notify me of new comments via email.

You may experience issues viewing this site in Internet Explorer 9, 10 or Contents of BS EN This website is best viewed with browser version of up to Microsoft Internet Dn 8 or Firefox 3. Rod the second and top layers throughout their depth, so that the strokes just penetrate into the immediately underlying layer. Standards Subscriptions from ANSI provides a money-saving, multi-user solution for accessing standards.

  KEITH ANSELL PEARSON GERMINAL LIFE PDF

BS EN – Testing fresh concrete. Sampling (British Standard)

Apparatus Container, large enough to provide at least 75 mm of concrete in all directions around the 122350-1 of the temperature measuring device, or at least three times the NMAS Nominal Maximum Aggregate Sizewhichever is greater. After this, the design mix specific to the particular type of 13250-1 recommends the discharge time limit waived against what is stated in the specifications.

When mixing and sampling of concrete is done 123500-1 a laboratory, different procedures may be required. Leave the TMD in the concrete a minimum of 2 min. Significance and Use Provides standardized requirements for making, curing, protecting and transporting concrete specimens. It depends upon the project specifications on particular project 123500-1 of jurisdiction.

The Amber document status indicator indicates that some caution is needed when using this document – it is either: Materials handling, Test specimens, Sampling methods, Concretes, Samples, Cement and concrete technology.

Ensure that the compacting rod, or bar, does not forcibly strike the bottom of the mould when compacting the first layer, nor penetrate significantly any previous layer.

Records shall be kept to ensure the traceability of the specimen from sampling to testing. If the document is revised or amended, you will be notified by email.